11 May 2026
هندسة البرومبت المتقدمة مع Claude: التفكيك والتثبيت وسلاسل التفكيرAdvanced Claude Prompt Engineering: Decomposition, Anchoring and Chain of Thought
Use three techniques together to get sharper, traceable answers from Claude: decompose big tasks, anchor role and format, and make Claude reason before it answers. All of it runs in the chat or in Claude Code on your subscription.
Who this guide is for
Developers and technical founders who use Claude daily and want consistent, reviewable output
Key terms
- Decomposition
- Asking Claude to split a big task into ordered steps first, then running each step with its own prompt.
- Anchor statement
- One short instruction that fixes three things: the role Claude plays, the main constraint, and the output format.
- Drift
- In long conversations the model slowly moves away from your original instructions.
- Chain of thought
- Making Claude write out its reasoning steps before the final answer, so you can check and correct each step.
- System prompt
- Instructions Claude reads before your messages. In Claude Code you can pass one with a flag. In the chat, project instructions play the same role.
The steps
Step 1
Split the task before you ask
Claude does its best work on one specific task at a time. Pack ten requirements into one prompt and every part comes back average.
Decomposition fixes this. First ask Claude for a plan only, then run each step with its own prompt. Claude tracks one objective at a time, and you can review and correct each output before moving on.
Paste the prompt below in a new chat, fill the task, and read the plan before you run anything.
PromptDecomposition planYou are a senior software architect. Decompose the following task into discrete, ordered subtasks. Task: [paste your task here] For each subtask give: 1. One clear objective (one sentence) 2. Required inputs (information or files needed) 3. Expected output (what gets produced) 4. Dependencies (which earlier subtask must be done first) Do not start executing any subtask. Only produce the plan. Number the subtasks and keep the total between 4 and 7. If a subtask needs a human decision or outside input, mark it [HUMAN CHECKPOINT].
Tip: If a task takes more than two paragraphs to describe, that is the signal to split it.
7 more steps wait for you after access
With the ready prompts and the takeaway
Bought this before? Restore your access
Your access is tied to your email. Enter it here and the content opens right away, any time, on any device
Most value
Start building with me now
We sit together, break down your problem, and I build the AI solution with you step by step
- A private session with you
- Real building during the session
- Results you take with you when we finish
100% free
A free consultation about your problem