خطة ٦ + ٢ لفريقك: ستة أسابيع تجريب وأسبوعين دمج، مثل طريقة أبل الجديدة في iOS 28The 6 + 2 Plan for Your Team: Six Weeks to Explore, Two Weeks to Merge, Like Apple's New iOS 28 Approach

Split any eight week project into six weeks of building and exploring and two weeks of merging and testing, with a fixed lock day and a ready prompt for each phase.

Who this guide is for

Founders and small teams building a product, a tool or content, who feel their ideas get locked in too early.

Key terms

Milestone
A block of work with a start, an end and one goal. Apple splits each year of OS development into three milestones of eight weeks each.
Convergence
The time when you stop adding anything new and integrate what you built, testing it until it works as one.
Lock day
The day you decide what makes the milestone and what waits. After it, no new features.
The 6 + 2 split
According to Mark Gurman at Bloomberg (8 November 2026), the first milestone of iOS 28 became six weeks of coding and exploration and two weeks of convergence, instead of four and four.

The steps

  1. Step 1

    Set the milestone and the lock day

    Pick one project of about eight weeks and write its goal in one line.

    Put the lock day at the end of week six, exactly, and put it on the calendar where everyone sees it. That day is what keeps the six weeks free without turning into chaos.

    I have a project called [project name] with the goal [goal in one line]. It runs eight weeks starting [start date]. Split it into six weeks of building and exploring and two weeks of merging and testing. Give me a week by week table, set the lock day as a date, and under each week write what should be ready.
    PromptMilestone plan

    Tip: The lock day does not move. Move it once and six weeks become eight and the merge disappears.

  2. Step 2

    Write the idea list before you start

    On day one, write down every idea you could try in this milestone, even the odd ones.

    Rank them by value and effort and pick three to five to start with. The rest stay on the list, not in your head.

    These are my ideas for [project name]: [paste ideas]. Put them in a table with: the idea, user value from 1 to 5, effort from 1 to 5, and the fastest way to test it within a week. Suggest the best five to start with and why.
    PromptIdea list
  3. Step 3

    Test fast, review weekly

    During the six weeks, every idea becomes a quick prototype: a page, a screen, a script or a first draft.

    At the end of each week, review in fifteen minutes: what worked, what failed, what continues next week. Lock nothing in this phase.

    Here is what I tested this week on [project name]: [prototypes and results]. Summarize what worked and why, what failed and what I learned, and three steps for next week. Remind me how many weeks are left until lock day [date].
    PromptWeekly review

    Tip: A winning prototype does not need to be pretty. It needs to answer one question.

  4. Step 4

    Lock day: choose what goes in

    On lock day, put every prototype on the table and decide: in now, next milestone, or dropped.

    Anything that goes in must be ready to integrate within two weeks. Anything that needs more waits, without hesitation.

    These are my prototypes at the end of week six: [list with the state of each]. I have only two weeks to merge and test. Sort them into in now, postponed, dropped. Justify each in one line and flag anything that needs more than two weeks.
    PromptLock decision
  5. Step 5

    Two weeks of merging: nothing new

    From lock day, the whole team works only on integrating, testing and fixing. Any new idea goes on the next milestone's list.

    Test the parts together from day one, because the hardest problems show up where the parts meet.

    These parts made the milestone: [list]. Write a test plan for the two merge weeks: how the parts work together, what can break between them, and the testing order from riskiest to least risky. Make it a day by day table.
    PromptMerge checklist

    Tip: Two weeks is short. Start joint testing on day one, not in the last two days.

  6. Step 6

    Review the milestone and start the next

    On the last day, sit with the team for thirty minutes: were six weeks enough to explore? Were two weeks enough to merge?

    If the merge felt tight, try five and three next milestone. The split is a tool, not a law.

    I finished a 6 + 2 milestone on [project name]. Here is what happened: [summary of exploration, what went in, merge problems]. Help me decide whether to keep the same split or change it next milestone, and suggest the first three ideas from the postponed list.
    PromptMilestone review

Ready prompts to copy

Write a short message to my team explaining that we will work in eight week milestones: six weeks of free exploration, a lock day on [date], then two weeks of merging with no new features. Keep it clear and encouraging, and end with a question asking the team which idea they want to try first.
PromptA message to the team about the new way

The takeaway

Exploring needs time, and locking needs a fixed day. Give ideas six weeks, and protect the two merge weeks no matter what.

Most value

Start building with me now

We sit together, break down your problem, and I build the AI solution with you step by step

60minutes
  • A private session with you
  • Real building during the session
  • Results you take with you when we finish
Book a build session

100% free

A free consultation about your problem

Start